|
|
|
|
Emergency Bridge Repair |
|
 |
|
| |
Emergency Repair of Pueblo Street Bridge: City of Santa Barbara
Bengal Engineering designed emergency repairs to a City bridge which was damaged by scour of winter rains. The design and construction of this fast-track project was completed in 2 months. |
|
Pueblo Street Bridge |
Emergency Retrofit of 13TH St. Bridge:
2004 Project of the Year California Society of Professional Engineers Ventura & Santa Barbara Counties
Vandenberg AFB, Lompoc CA
|
Bengal Engineering completed the innovative emergency retrofit of a 500-foot-long highway bridge.
|

Photo of completed Bridge Retrofit:
Note that strengthen measures are nearly invisible.
|
|
|
|
|
|
|
 |
|