2002 APWA Central Coast Chapter Project of the Year:
Structures: Design Innovation
Expansion of sewer plant
nearly complete. Micro-filtration and reverse-osmosis
equipment in place. Grading continues
in foreground, photo left.
(Photo by Jim Perry “Hotshots”)
Bengal Engineering prepared plans
and specifications for Laguna Sanitation District
as a fast-track change order when plans prepared
by others, encountering unanticipated ground water
and liquefiable soils, proved unworkable.
The original concept of spread
footings that required dewatering was replaced with
Bengal Engineer's design of deep foundations. The
Bengal concept minimized cost, time and disruption
to the existing plant.
Bengal worked closely with the
District and the contractor while construction continued.