|
|
|
|
|
Structures |
|
 |
|
|
Habitat |
 |
Bird Island Refuge Structures |
| |
Bengal Engineering designed these robust structures to provided habitat for nesting birds on the beautiful California coastline. |
| |
|
| |
Carpinteria Reservoir |
APWA Central Coast Project of the Year: 2003:
Category = Structures + $10 Million |
| |
|
| |
|
| |
Santa Maria Reservoir |
2002 APWA Central Coast Chapter Project of the Year:
Structures: Cost Reduction Incentive Program |
| |
|
| |
Seven
Million Gallon Water Reservoir. Fast-track design and detail
of timber frame roof and concrete support columns. |
| |
|
Santa Maria
Reservoir: Wood roof framing complete:
62,880
Sq. ft of “Alaskan Yellow
Cedar” Glue-lams. |
| |
|
| |
Oil Lease
- Ellwood, California |
| |
|
Wall construction in Narrow
Excavation
|
PS&E for
the construction of retaining walls for 2 oil field
piers located in an environmentally sensitive area.
|
| |
|
| |
Laguna Sanitation
District Plant Expansion |
2002 APWA Central Coast Chapter Project of the Year:
Structures: Design Innovation |
| |
|
Expansion of sewer plant
nearly complete. Micro-filtration and reverse-osmosis
equipment in place. Grading continues
in foreground, photo left. |
Bengal Engineering prepared plans
and specifications for Laguna Sanitation District
as a fast-track change order when plans prepared
by others, proved unworkable.
|
| |
|
| |
Beach Access Stairway |
Camino Del Sur Beach Access
Stairway
near UCSB, Santa Barbara,
CA |
Bengal Engineering designed a beach access stairway
to withstand tremendous pounding wave forces
present at the site. Environmental concerns shaped
design and construction, limiting options for
the project. |
| |
|
Winter waves pound beach, as seen from the Camino
Del Sur stairway |
| |
|
Winter storm pounding while the stairs stand
firm. |

|
|
|
|
|
|
|
|
|
 |
|