top of page

ARANA GULCH & HAGEMANN GULCH BRIDGE

ARANA GULCH TRAIL &

HAGEMANN GULCH STRESS RIBBON BRIDGE 

 

Santa Cruz, CA

Built 2015

MULTI USE TRAIL DESIGN | BRIDGE DESIGN | STRUCTURE DESIGN | GEOTECHNICAL ENGINEERING

This multi-use trail included two keystone elements designed by Bengal Engineering. The most unique element was the 350-foot clear span stress-ribbon bridge. The foundation was comprised of a series of ground anchors. Bridge construction consisted of prefabricated panels placed on a set of 6 pre-stressed cables.  This style of bridge is one of the few in the United States.

bottom of page