top of page

CABRILLO BOULEVARD BRIDGE  

LOWER MISSION CREEK IMPROVEMENTS

 

Santa Barbara, CA

Built 2017

apwaLogo1.png
ASCE BADGE.JPG

2017/18 Project Of The Year

CIVIL ENGINEERING | BRIDGE ENGINEERING | MULTI USE TRAIL DESIGN | STRUCTURE DESIGN | HYDRAULIC ENGINEERING | GEOTECHNICAL ENGINEERING | ROADWAY ENGINEERING

The Cabrillo Blvd bridge replacement was one of the largest capital funded projects in recent years for the City of Santa Barbara. It was also one of the most visible to the public. This multiyear project replaced an ocean front bridge that dated back to the early 1900's that was weight restricted due to its condition. Because of the general site conditions, two unique non-standard pile methods were used in foundation construction. The carefully planned construction staging was critical to the success in delivering this $25 million project.

bottom of page