

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
THE BENGAL ENGINEERING TEAM
​
PRINCIPLES​

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
COHANSEY AVE BRIDGE
BRIDGE & CHANNEL IMPROVEMENTS
Gilroy, CA
Built 2018




The Cohansey Avenue Bridge over Llaga’s Creek In Gilroy, CA connects two new residential developments. The bridge structure is a cast-in-place pre-stressed box girder bridge spanning 160-ft. Other vital project elements were accommodating future bike way below the bridge, roadway and pedestrian improvement to stich these neighborhoods together.
BRIDGE ENGINEERING | ROADWAY ENGINEERING | STRUCTURE DESIGN | HYDRAULIC ENGINEERING
STEM & SOFFIT POUR
DECK POUR
