MAIN ST. AT SANTA ROSA CREEK BRIDGE

BRIDGE REPLACEMENT & ROADWAY IMPROVEMENTS

Cambria, CA

Built 2015

2015 Project Of The Year

Spanning Santa Rosa Creek, this cast in place pre stressed box girder structure sits on a gradual curve outside of Cambria California. Construction took place within inches of the existing bridge that was still in service. The project was not only award winning but also a very beautiful structure that fits the site perfectly.

BRIDGE ENGINEERING | STRUCTURE DESIGN | ROADWAY ENGINEERING 