

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
THE BENGAL ENGINEERING TEAM
PRINCIPLES

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

CIVIL ENGINEERING
no matter the size or budget your project will be recieving the attention of profecianals with over 100 years of combined experience

CIVIL ENGINEERING
no matter the size or budget your project will be recieving the attention of profecianals with over 100 years of combined experience
EIGLEBERRY STREET
ROADWAY IMPROVEMENTS
Gilroy, CA
Built 2016

ROADWAY ENGINEERING
Eigleberry Street was scoped to be a resurfacing project but after a field walk with City staff it was realized the disrepair and needed rehabilitation. Bengal reconfigured the roadway and designed pedestrian/sidewalks improvements for 10 blocks in Gilroy Ca. The end result redefined the roadway configuration of a highly trafficked residential and commercial corridor in the heart of downtown. This project included new pavement resurfacing, striping delineation, sidewalk repair and new ADA curb ramps for 10 blocks from 1st St. to 10th St.
