

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
THE BENGAL ENGINEERING TEAM
​
PRINCIPLES​

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
MAIN ST. AT SANTA ROSA CREEK BRIDGE
BRIDGE REPLACEMENT & ROADWAY IMPROVEMENTS
​
Cambria, CA
Built 2015
2015 Project Of The Year





BRIDGE ENGINEERING | STRUCTURE DESIGN | ROADWAY ENGINEERING
Spanning Santa Rosa Creek, this cast in place pre stressed box girder structure sits on a gradual curve outside of Cambria California. Construction took place within inches of the existing bridge that was still in service. The project was not only award winning but also a very beautiful structure that fits the site perfectly.
