

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
THE BENGAL ENGINEERING TEAM
PRINCIPLES

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.

CIVIL ENGINEERING
no matter the size or budget your project will be recieving the attention of profecianals with over 100 years of combined experience

CIVIL ENGINEERING
no matter the size or budget your project will be recieving the attention of profecianals with over 100 years of combined experience
MAIN ST. AT SANTA ROSA CREEK BRIDGE
BRIDGE REPLACEMENT & ROADWAY IMPROVEMENTS
Cambria, CA
Built 2015
2015 Project Of The Year





BRIDGE ENGINEERING | STRUCTURE DESIGN | ROADWAY ENGINEERING
Spanning Santa Rosa Creek, this cast in place pre stressed box girder structure sits on a gradual curve outside of Cambria California. Construction took place within inches of the existing bridge that was still in service. The project was not only award winning but also a very beautiful structure that fits the site perfectly.