Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
THE BENGAL ENGINEERING TEAM
​
PRINCIPLES​
Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
Jon Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
James Doe
I’m a paragraph. Double click me or click Edit Text, it's easy.
no matter the size or budget your project will be recieving the attention of profecianals with over 100 years of combined experience
CIVIL ENGINEERING
no matter the size or budget your project will be recieving the attention of profecianals with over 100 years of combined experience
CIVIL ENGINEERING
MASON ST BRIDGE
& LOWER MISSION CREEK IMPROVEMENTS
Santa Barbara, CA
Built 2016
2017 PROJECT OF THE YEAR
ROADWAY ENGINEERING | STRUCTURE DESIGN | BRIDGE ENGINEERING | GEOTECHNICAL ENGINEERING | HYDRAULIC ENGINEERING
The Mason Street Bridge project was wedged between two reaches of Lower Mission Creek Flood Control Project and three multi-million-dollar private developments. Bengal Engineering was able to balance the bridge project to develop a one of a kind bridge structure that fit with all the dynamics of the site. To our knowledge, the foundation for the bridge was the first with this system in the state of California.